Preparation of Pre-Construction Design Studies, for Construction of the Access Road and Bridges for Bakhvi 3 Hydro Electric Power Station


Design and construction drawings considering alignment for rural area project road, parameters compliant with the relevant technical parameters of rural road. (such as horizontal and vertical radii, road dimensions, its single slope cross profile, super elevations and etc.);

Design and construction drawings for 3 bridges;

Start Date:

January, 2015

End Date:

February, 2015

Country:

Georgia

Client: 

FICHTNER GmbH. KG

Source of Funds:

FICHTNER GmbH. KG

Role on the Assignment: ESL, Sole Consultant