Design and Supervision for Rehabilitation of Dzevera-Shertuli Irrigation System (III B)


Design and Supervision of the “Rehabilitation of Dzevera Shertuli Irrigation System main channel from pk 95+25 to pk 122+88 and internal network from G-19 to G-34 (III b Lot) including access roads

Start Date:

August, 2017

End Date:

June, 2019

Country:

Georgia

Client: 

Ministry of Agriculture of Georgia

Source of Funds:

 International Fund for Agricultural Development (IFAD)

Role on the Assignment: ESL, Sole Consultant