Preparation of Pre-Construction Design Studies, for Construction of the Ruisi-Rikoti Section (Km 95-Km 143) of the E-60 Highway (Section 19-31 km)
Detailed design and Detailed construction drawings considering alignment for four-lane project road, parameters compliant with the relevant technical parameters of four-lane motorway (such as horizontal and vertical radii, road dimensions, its single slope cross profile, super elevations and etc.);
Right of the Way (RoW) and parameters and standards of four-lane highway;
Resettlement Action Plan, that takes into account the complete census of land plots to be acquired, vicinity of settled areas and the highway access possibilities for population;
Work and Traffic management plans, in order to consider that in locations, where the existing alignment remains, construction will take place without traffic interruption;
Environmental Study, including design for landscape, environment protection/restoration and assess the requirement for slope protection measures adjacent to the road and design cost-effective remedial works
Start Date: |
March, 2013 |
End Date: |
May, 2013 |
Country: |
Georgia |
Client: |
Roads Department of the Ministry of Regional Development and Infrastructure of Georgia |
Source of Funds: |
The World Bank |