Preparation of Pre-Construction Design Studies, for Construction of the Ruisi-Rikoti Section (Km 95-Km 143) of the E-60 Highway (Section 0-19 km)


Detailed design and Detailed construction drawings considering alignment for four-lane project road, parameters compliant with the relevant technical parameters of four-lane motorway (such as horizontal and vertical radii, road dimensions, its single slope cross profile, super elevations and etc.);

Right of the Way (RoW) and parameters and standards of four-lane highway;

Resettlement Action Plan, that takes into account the complete census of land plots to be acquired, vicinity of settled areas and the highway access possibilities for population;

Work and Traffic management plans, in order to consider that in locations, where the existing alignment remains, construction will take place without traffic interruption;

Environmental Study, including design for landscape, environment protection/restoration and assess the requirement for slope protection measures adjacent to the road and design cost-effective remedial works

Start Date:

October, 2012

End Date:

January, 2013

Country:

Georgia

Client: 

Roads Department of the Ministry of Regional Development and Infrastructure of   Georgia

Source of Funds:

World Bank

Role on the Assignment: ESL, Sole Consultant