Review and integration of the Legislative Framework and Social Baseline of the ESIA for the ERM-Spectrum project “2D Seismic Survey in the Black Sea”


Review and integration of the Legislative Framework and Social Baseline of the ESIA for the ERM-Spectrum project “2D Seismic Survey in the Black See”

Start Date:

October, 2015

End Date:

October, 2015

Country:

Georgia

Client: 

ERM Italia SpA

Source of Funds:

ERM Italia SpA

Role on the Assignment: ERM Italia SpA (Leading) /ESL(Sub-Consultant)